Does every team solve the same problem?
Yes. The cargo, test area, performance rules, and required evidence are shared. Your mechanism, motions, structure, CAD parts, and control-pad design must reflect your team’s own decisions.
What are the base and control-pad limits?
The fixed machine base must fit within a 12 × 12-inch footprint and remain outside the start and target areas. Moving parts may extend beyond the base. The separate control pad has no size limit but must be stable, labeled, and outside the test area.
How is the test area measured?
The closest edge of the 4 × 4-inch start zone is 12 inches from the closest edge of the 6 × 6-inch target. The cargo begins centered in the marked start position. The target’s usable landing surface is 4 inches above the start surface.
How many hydraulic motions are required?
At least two independently controlled hydraulic motions are required. A third independently controlled motion may earn bonus points after the required system qualifies.
What CAD and fabrication work is required?
Each team creates at least two original functional CAD parts that are 3D printed, functional laser-cut machine components, and a laser-cut or engraved control pad with labels and arrows.
May we use a model from Thingiverse or Printables?
Yes, with teacher approval and attribution. Record the creator, website, and license. A downloaded or remixed part may support the machine but does not count as one of the two required original CAD parts.
May we bring materials from outside the classroom?
Yes, after approval. No student is required to purchase materials, and cardboard is not an approved construction material.
Who may touch the machine during a trial?
One operator may touch only the input plungers or attached control handles. No one may touch the cargo, machine structure, tubing, moving mechanism, or target after “go.” Teams may rotate operators between trials.
What makes an official trial successful?
Within 60 seconds, the machine must move and release the cargo completely on or inside the 6 × 6-inch target tray without prohibited contact. The cargo must remain still for 3 seconds.
What makes an attempt unsuccessful?
An attempt is unsuccessful if time reaches 60 seconds; the cargo is dropped and not recovered by the machine; the base or target moves; a hose disconnects or a major leak stops operation; prohibited contact occurs; the cargo is not fully on the landing surface; or the 3-second hold is not completed.
What may happen between official trials?
Reset the cargo and controls to their recorded start positions. Teacher-approved refilling or reseating of a connection may be recorded for safety, but teams may not change geometry, syringe sizes, linkages, control limits, or the design during the five official attempts.
What goes into the portfolio each week?
Use the checkpoint map above. The team updates one shared portfolio, while each student completes at least three dated engineering-record entries separately every week.
Can we use AI during the project?
AI may help explain concepts, generate research terms, or troubleshoot a failure your team has documented. It may not create your sketches, measurements, test data, observations, selection decision, or complete design.